Projects

Capitol District

Hospitality

This 250,575 square-foot, 12 story apartment building contains 218 units as well as two levels designated as commercial/retail space. This project took advantage of our VDC/BIM capabilities and used that information to aid in the prefabrication and kitting of material for each of the 218 individual apartment units. We began by drawing the domestic water, sanitary waste and sanitary vent systems within the coordinated model, standardizing each apartment type for ease of prefabrication and installation. We used our BIM drawings to prefabricate complete riser assemblies for over 70% of the apartments and made kits containing the fittings and accessories required to put together the non-prefabricated apartments. This process simplified field work and made it safer to perform by bringing it into the controlled environment of our fab shop.
Read More
Centro

Hospitality

We had no reservations about this design/build job. The Waldinger Corporation performed the plumbing, piping and HVAC work for Centro, a chic Des Moines restaurant and kitchen in the remodeled Temple for the Performing Arts. Centro (pronounced "chen-tro") literally means city center, which this hot restaurant has certainly become since its launch.
Read More
Waldinger collaborated with suppliers and onsite trades to design, prefabricate and install...
Read More
The Wire

Hospitality

The 380,000 square-foot space at The Wire boasts 300 apartments installed into the remodeled former Northwestern Bell Regional Headquarters, built in the 1950s. The building consists of 12 stories, including an underground parking structure, several common area spaces and an enclosed roof top pool area.
Read More