Projects

ATN 5 & 6 Data Center

Mission Critical

Waldinger's mechanical and plumbing scope on this 993,170 square-foot facility...
Read More
NE1 Data Center

Mission Critical

This data center in La Vista, Nebraska provides a major internet search engine company with all of their required server capacity for the Midwestern region of the United States. Waldinger was the lead CAD Manager for the project. We managed the 3D BIM process for all trades. The extensive coordination effort included architectural, electrical, mechanical, temperature controls, security, fire alarms; and data cabling under the four-foot-high raised floor.
Read More
Project Oasis

Mission Critical

This Tier III, 4 MW (day one) data center in Omaha was a fast-track, design assist project consisting of data hall space, chiller plant, supporting MEP rooms and administrative areas. The N+1 facility contains over 2,000 tons of cooling accomplished with a combination of full mechanical, mechanical assisted and 100% economizer modes. The design included a thermal energy storage (TES) system for emergency cooling. This TES tank houses Waldinger prefabricated internal flow distributors (or diffusers) which supply 60-degree chilled water for up to 10 minutes to mission critical cooling equipment at a peak thermal load of 750 tons, in the event of chiller plant failure. We 3D modeled all mechanical, HVAC and plumbing components, coordinated and collision checked with Navisworks and BIM 360 Glue clash detection software. Our services included support thru Level 5 commissioning.
Read More
Verizon Wireless

Mission Critical

Construction of the Verizon Wireless Mobile Switching Data Center facilitated the expansion of Verizon's business in the Omaha area. The single-story building consists of 180 tons of cooling. Waldinger completed the entire mechanical package, including the site utilities, HVAC, sheet metal, fuel oil installation as well as test and balance services.
Read More